摘要
以防城港二期核电工程电气贯穿件相关技术要求为基础,介绍了华龙一号核电站电气贯穿件的功能,比对了GB/T 13538—2017、IEEE 317-2013、GB/T 25837—2010等相关标准对中压电气贯穿件的要求,探讨中压电气贯穿件电气试验的参数选择,以期为电气贯穿件的国产化的设计、制造和鉴定提供借鉴和参考。
Based on the relevant technical requirements of electrical penetration assembly of Fangchenggang second phase nuclear power project,this paper introduced the function of electrical penetration assembly of Hua-long pressurized reactor and compared the different requirements of GB/T 13538-2017,IEEE 317-2013,GB/T 25837-2010 and other related standards for medium voltage electrical penetration assembly,discussing the selection of parameters for electric test of medium voltage electrical penetration assembly,which provides the references for the design,manufacture and identification of localized electrical penetration assembly.
作者
俞高伟
张甬
YU Gao-wei;ZHANG Yong(Shanghai Power Equipment Research Institute Co.,Ltd,Shanghai 200240,China;China Nuclear Power Engineering Co.,Ltd,Shenzhen 518124,China)
出处
《电工电气》
2018年第11期49-51,共3页
Electrotechnics Electric
关键词
华龙一号核电站
电气贯穿件
工频耐压试验
脉冲电压试验
局部放电试验
HPR1000(Hua-long pressurized reactor)
electrical penetration assembly
power frequency voltage test
impulse voltage test
partial discharge test