期刊文献+

全数字化水电站构建探讨 被引量:4

Discussion on construction of fully digital hydropower project
下载PDF
导出
摘要 2014年底我国水电装机容量已突破3亿k W,居全球之首。随着电力行业技术的不断进步,国内部分企业已投身开展数字化、智能化水电站建设尝试,并取得了一定的成果。本文结合当前水电站数字化建设的现状,依据有关规程规定,对数字化水电站的特点、优点、系统构架进行了分析和研究,建设、运营全数字化水电站虽然面临一些挑战,但技术上是可行的。 By the end of 2014,China had a total hydropower installed capacity up to 300 GW,ranking top in the world.Along with the continuous technological progresses made in the electric power industry,some Chinese enterprises have attempted to construct digital and intelligent hydropower projects and made certain achievements.This paper presents analysis and study on the characteristics,advantages and system structure of digital hydropower project based on the current situations of digitalization of hydropower projects according to relevant codes,and concludes that digital hydropower projects are technically feasible in spite of some challenges in construction and operation.
作者 张宏 郗发刚 戴驱 ZHANG Hong;XI Fa-gang;DAI Qu(Huaneng Lancang River Hydropower Co.,Ltd.,Kunming,650214,China)
出处 《水电站机电技术》 2018年第11期56-58,96,共4页 Mechanical & Electrical Technique of Hydropower Station
关键词 水电站 数字化 特点 构架 挑战 Hydropower project Digitalization Characteristics Structure Challenge
  • 相关文献

同被引文献27

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部