摘要
城市地铁线网中的换乘站是连接各条线的纽带,一般会同期实施或者分期实施,且换乘站后面均带有配线。换乘形式的选择,决定了乘客的换乘便利性、时间的节省及乘坐的舒适感。以杭州地铁7号线耕文路站为例,通过对换乘方案的比选、内部用房的调整、出入口的优化,阐述换乘站设计。
Transfer stations in urban metro network are the links connecting all lines.They are usually constrcted in the same period or in stages,and there are links at the later stage of transfer stations.The choice of transfer forms determines the accessibility and convenience,time saving and overall comfort of passengers.Taking Gengwenlu Station of Hangzhou Metro Line 7 as an example,this paper expounds the design of transfer station by comparing and selecting transfer schemes,adjusting internal rooms and optimizing entrances and exits.
出处
《现代城市轨道交通》
2018年第11期36-39,43,共5页
Modern Urban Transit
关键词
地铁
换乘车站
设计
subway
transfer station
design