摘要
文章基于挂篮选型及主要特征,结合西江扶典口特大桥工程实例,探讨了利用线性变形控制技术的挂篮施工控制方法,应用形变分析软件计算桥跨结构所发生的几何变形,并根据计算结果对挂篮施工过程进行矫正控制,可供桥梁挂篮施工参考。
Based on the selection and main features of hanging baskets,and combined with the actual example of Xijiang Fudiankou Bridge project,this article discussed the hanging basket construction control method by using the linear deformation control technology,calculated the geometric deformation of bridge span structure through deformation analysis software,and conducted the correction control on the hanging basket construction process according to the calculation results,which can provide the reference for the hanging basket construction of the bridge.
作者
农基武
NONG Ji-wu(Guangxi Xianglu Construction Co.,Ltd.,Nanning,Guangxi,530029)
出处
《西部交通科技》
2018年第9期96-101,共6页
Western China Communications Science & Technology
关键词
桥梁工程
线性变形控制技术
挂篮施工
质量控制
施工
Bridge engineering
Linear deformation control technology
Hanging basket construction
Quality control
Construction