期刊文献+

利用线性变形控制技术的挂篮施工控制探讨 被引量:1

Discussion on Hanging Basket Construction Control by Using the Linear Deformation Control Technology
下载PDF
导出
摘要 文章基于挂篮选型及主要特征,结合西江扶典口特大桥工程实例,探讨了利用线性变形控制技术的挂篮施工控制方法,应用形变分析软件计算桥跨结构所发生的几何变形,并根据计算结果对挂篮施工过程进行矫正控制,可供桥梁挂篮施工参考。 Based on the selection and main features of hanging baskets,and combined with the actual example of Xijiang Fudiankou Bridge project,this article discussed the hanging basket construction control method by using the linear deformation control technology,calculated the geometric deformation of bridge span structure through deformation analysis software,and conducted the correction control on the hanging basket construction process according to the calculation results,which can provide the reference for the hanging basket construction of the bridge.
作者 农基武 NONG Ji-wu(Guangxi Xianglu Construction Co.,Ltd.,Nanning,Guangxi,530029)
出处 《西部交通科技》 2018年第9期96-101,共6页 Western China Communications Science & Technology
关键词 桥梁工程 线性变形控制技术 挂篮施工 质量控制 施工 Bridge engineering Linear deformation control technology Hanging basket construction Quality control Construction
  • 相关文献

参考文献3

二级参考文献6

共引文献4

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部