摘要
青岛新机场是国内首次将城市综合管廊引入机场航站楼的工程,其中,综合管廊内机电安装工程的施工是机场机电安装工程的关键线路。受航站楼整体结构施工的影响,在关门工期不变的情况下,通过对航站楼综合管廊内机电安装工程施工工艺的优化及施工技术的研究,在保证施工质量及安全的前提下,缩短了综合管廊内机电安装工程的施工工期,取得了良好的社会效益及经济效益。
Qindao New Airport is the first domestic project which applied urban utility tunnel to airport terminal building.Among which,the construction of mechanical and electrical installation engineering in the utility tunnel is the key line of airport electrical and mechanical installation project.Affected by the overall structure construction of the terminal building under the condition of fixed construction period,and through the study on the optimization of construction technologies of the mechanical and electrical installation engineering in the utility tunnel of the terminal building and under the premise of ensuring the construction quality and safety,the construction period of the mechanical and electrical installation engineering in the utility tunnel is shortened and good social and economic benefits are achieved.
作者
孙慎林
巫鹏
丁党盛
张健康
侯少文
SUN Shenlin;WU Peng;DING Dangsheng;ZHANG Jiankang;HOU Shaowen(The Fourth Construction Co.,Ltd.of China Construction Eighth Engineering Division,Qingdao,Shandong 266000,China)
出处
《建筑施工》
2018年第10期1786-1788,共3页
Building Construction
关键词
机场工程
“文”形综合管廊
虚实匹配与量化分析
免搭设操作平台
airport engineering
"文"shaped utility tunnel
virtual-real matching and quantitative analysis
operation platform without erection