陡变水位深水桩基施工关键技术 被引量:14

Key Construction Techniques for Deep-Water Pile Foundation in Steeply-Variable Water Area
下载PDF
导出
摘要 童庄河大桥主桥为(45+100+320+100+45)m双塔双索面混凝土梁斜拉桥,桥塔墩基础采用整体式矩形承台,其下布置11根2.8m、长63m的钻孔灌注桩。桥址河床陡峭,覆盖层松散、岩石破碎、多洞穴等,桩基施工期间水位变化达30m。为解决钢护筒精确着床、施工期间水位陡变的难题,采用"钢护筒+钻孔平台"相结合的平台系统进行桩基施工。施工平台系统由锚碇、拼装浮运系统、钢护筒、钻孔平台和导向架等组成。施工时,钻孔平台在驳船上拼装并浮运至墩位,每个平台利用2个10t岸锚和4个5t铁锚进行定位锚固,然后安装钢立柱定位导向架,插打钢护筒实现钻孔平台精确定位;利用8点提升方式进行钻孔平台提升,完成体系转换,形成固定钻孔平台;采用冲击反循环施工工艺完成钻孔施工。 The main bridge of Tongzhuang River Bridge is a two-pylon concrete girder cable-stayed bridge with spans of 45,100,320,100,and 45 m.The stay cables are fanned out in double cable planes.The foundation of the pylon pier,which is topped by integral rectangular pile cap,consists of 11,?2.8 m bored piles,63 m long each.The river bed at the bridge site is steep,with loose overburden,damaged rocks and numerous caves,and the water level change reaches up to 30 m during the pile foundation construction.To resolve the problem of accurate landing of steel casings and handle the situation of sudden change of water level during construction period,a platform system formed of steel casings and pile drilling platform was used to the pile foundation construction.The construction platform system is formed of steel anchor,assembly and floating system,steel casings,pile drilling platform and guiding frame.During the construction,the pile drilling platform was assembled on the barge and floated to the pier sites.Each platform was anchored by two bank anchorages with a capacity of 10 t each and four iron anchorages with a capacity of 5 t each.Then,the steel post position guiding frame was installed,and the steel casings were driven to realize the accurate positioning of the pile drilling platform.The pile drilling platform was lifted by way of eight-point lifting method,to realize the systematic transformation and form the permanent pile drilling platform.And the impact reverse circulation construction technique was used to complete the pile drilling construction.
作者 郑义 刘旭 刘为民 张豪 韩庆雄 ZHENG Yi;LIU Xu;LIU Wei-min;ZHANG Hao;HAN Qing-xiong(Transportation Department,Zigui County,Hubei Province,Zigui 443600,China;China Railway Major Bridge Engineering Group Co.,Ltd.,Wuhan 430050,China;Henan Tongji Road&Bridge Engineering Technology Co.,Ltd.,Zhengzhou 450000,China)
出处 《世界桥梁》 北大核心 2018年第6期26-30,共5页 World Bridges
基金 湖北省交通运输厅科技项目(2014-721-1-2)
关键词 斜拉桥 钻孔灌注桩 钻孔平台 导向架 钢护筒 施工技术 cable-stayed bridge bored pile pile drilling platform guiding frame steel casing construction technique
  • 相关文献

二级参考文献63

共引文献108

同被引文献75

引证文献14

二级引证文献82

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部