确定隧洞开挖面极限支护力最值在隧洞开挖中极为重要。当盾构机通过上软下硬复杂地层时,若隧洞开挖面支护压力控制不当,极易引起隧洞开挖面失稳,对施工安全构成巨大威胁。针对上述状况,采用引入孔隙水压力修正后的计算模式对某盾构隧洞开挖面极限支护力进行了理论计算,并利用数值模拟方法对上述计算结果进行了验证。对复杂地质条件下盾构施工引起的开挖面变形及开挖面前方地表沉降、隆起规律进行了分析。相关成果可为复杂地质条件盾构隧洞开挖面极限支护力最值的确定及安全施工提供依据。
It is very important to determine the ultimate supporting force of tunnel excavation face.When a shield machine goes through a upper-soft and lower-hard stratum,the support pressure of tunnel excavation face is hard to control,which is likely to induce instability of tunnel excavation surface.The ultimate supporting force of a shield tunnel excavation face is calculated by introducing the pore water pressure correction mode,and the above calculation results are verified by numerical simulation method.Finally,the deformation laws of excavation face and the front ground subsidence or uplift caused by shield tunneling are analyzed under complex geological conditions.The results can provide reference for the determination of the maximum value of the ultimate supporting force of shield tunnel excavation face and the safe construction in the complex geological conditions.
作者
闫军涛
姜新佩
王枭华
霍恒炎
刘波
YAN Juntao;JIANG Xinpei;WANG Xiaohua;HUO Hengyan;LIU Bo(Institute of Water Conservancy and Hydro-Electric Power,Hebei University of Engineering,Handan 056038,China;State Key Laboratory of Hydraulic Engineering Simulation and Safety,Tianjin University,Tianjin 300072,China)
出处
《人民长江》
北大核心
2018年第21期61-67,共7页
Yangtze River
关键词
极限支护力
地表变形规律
上软下硬地层
盾构隧洞
ultimate supporting force
ground deformation law
upper-soft lower-hard ground
shield tunnel