期刊文献+

两阶段混合算法求解集成工艺规划与调度问题 被引量:7

Two-stage Hybrid Algorithm for Integrated Process Planning and Scheduling Problems
下载PDF
导出
摘要 提出了求解集成式工艺规划与车间调度问题的两阶段混合算法。在工艺规划阶段,使用遗传算法为每个工件生成可选的近优工艺路线集,动态地为车间调度阶段输入已确定的工艺路线;在车间调度阶段,使用蜜蜂交配优化算法快速寻优,设计了蜂王婚飞的流程以保证算法的全局搜索能力,构建了基于不同邻域结构的工蜂培育幼蜂局部搜索策略。使用基准测试集对提出的方法进行验证,并与现有算法进行对比,计算结果证明了提出方法的有效性。 A two-stage hybrid algorithm was designed for solving integrated process planning and scheduling problems.In process planning stage,genetic algorithm was utilized to generate alternative near-optimal process plan sets for each job.The alternative near-optimal process plan sets were used to input special process plans of jobs to job shop scheduling stage dynamically.In job shop scheduling processes,honey bees mating optimization algorithm was employed for searching the optimal solution effectively.Queen s mating flight processes were designed to guarantee the global search capability of the proposed algorithm,while workers were constructed as local search strategies to improve the broods based on different neighborhood structures.Benchmark instances were used to evaluate the performance of the proposed algorithm.The comparisons with other algorithms were also presented,which verified the effectiveness of the proposed method.
作者 文笑雨 罗国富 李浩 肖艳秋 乔东平 WEN Xiaoyu;LUO Guofu;LI Hao;XIAO Yanqiu;QIAO Dongping(Henan Key Laboratory of Intelligent Manufacturing of Mechanical Equipment, Zhengzhou University of Light Industry,Zhengzhou,450002)
出处 《中国机械工程》 EI CAS CSCD 北大核心 2018年第22期2716-2724,2732,共10页 China Mechanical Engineering
基金 河南省产学研合作计划资助项目(172107000019) 国家自然科学基金资助项目(51775517) 河南省高等学校重点科研项目(15A460037) 郑州轻工业学院博士科研基金资助项目(2014BSJJ0023)
关键词 集成式工艺规划与车间调度 遗传算法 蜜蜂交配优化 局部搜索 integrated process planning and scheduling genetic algorithm honey bees mating optimization local search
  • 相关文献

参考文献8

二级参考文献126

  • 1熊聪聪,冯龙,陈丽仙,苏静.云计算中基于遗传算法的任务调度算法研究[J].华中科技大学学报(自然科学版),2012,40(S1):1-4. 被引量:27
  • 2田颖,江平宇,周光辉,赵刚.基于遗传算法的工艺规划与调度集成方法[J].西安交通大学学报,2006,40(9):1041-1044. 被引量:12
  • 3董朝阳,孙树栋.基于免疫遗传算法的工艺设计与调度集成[J].计算机集成制造系统,2006,12(11):1807-1813. 被引量:10
  • 4吴德中,严隽琪,王丽亚.CAPP与PPC的并行分布式集成研究[J].上海交通大学学报,1996,30(12):1-6. 被引量:15
  • 5Blazewicz J, Domschke W, Pesch E. The Job Shop Scheduling Problem: Conventional and New Solution Techniques. European Journal of Operational Research, 1996, 93(1):1~33
  • 6Jain A S, Meeran S. Deterministic Job-Shop Scheduling:Past,Present and Future. European Journal of Operational Research. 1999,113(2): 390~434
  • 7Carlier J, Pinson F. An Algorithm for Solving the Job-Shop Problem. Management Science, 1989,35(2): 164~176
  • 8Laarhoven P V, Aarts E, Lenstra J K. Job Shop Scheduling by Simulated Annealing. Operations Research, 1992,40(1): 113~125
  • 9Nowicki E, Smutnicki C. A Fast Taboo Search Algorithm for the Job Shop Problem. Management Science, 1996, 42(6): 797~813
  • 10Rodammer F A, White K P. A Recent Survey of Production Scheduling. IEEE Trans.SMC, 1988,18(6): 841~851

共引文献191

同被引文献57

引证文献7

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部