期刊文献+

台阶型加筋土边坡动力响应 被引量:2

Seismic Responses of Tiered Geosynthetic Reinforced Slope
下载PDF
导出
摘要 为了研究台阶型加筋土边坡的动力响应,首先以印度理工学院振动台试验挡墙为原型,验证了有限元数值模拟方法的有效性;然后以一位于我国西南部、抗震设防烈度为7度的边坡工程为背景,利用有限元软件PLAXIS,在坡顶与坡脚相对位置不变的情况下,分析了其动力响应随台阶宽度变化的规律。结果表明,台阶宽度越大,坡面横向位移越小,但过大的台阶宽度对横向位移的减小效果不明显,存在一个最优宽度使最大坡面横向位移取得最小值;随着台阶宽度的增大,填土体积随之上升,下层边坡中筋材最大内力呈放大趋势,其沿高程的分布方式由反"∠"形逐渐过渡到类"3"字形。 In order to study the seismic responses of tiered geosynthetic reinforced slope,the suitability of numerical approach was validated by comparing with the measured results from a test wall in Indian Institute of Technology(IIT).Then,using a tiered reinforced slope located in the southwest China as a reference and the validated numerical simulation method,the seismic responses of tiered reinforced slope with different offset distances were analyzed,while keeping the relative positions of the slope crest and the toe.It is shown that the lateral facing displacements decreased with an increase in the offset distance.However,the effect of overly-large offset distance on the facing displacements is not obvious,and there existed an optimum offset distance.With the increase of offset distance,the volume of backfill soil increased,and the maximum reinforcement load in the lower tier was also higher.The distribution of the maximum reinforcement load along the elevation in the lower tier evolved from an opposite∠-shape to a 3-shape.
作者 樊成 刘华北 FAN Cheng;LIU Hua-bei(School of Civil Engineering and Mechanics,Huazhong University of Science and Technology,Wuhan 430074,China)
出处 《土木工程与管理学报》 北大核心 2018年第6期171-177,共7页 Journal of Civil Engineering and Management
基金 国家自然科学基金(51778259)
关键词 台阶型加筋土边坡 数值模拟 台阶宽度 动力响应 tiered reinforced slope numerical simulation offset distance seismic response
  • 相关文献

参考文献6

二级参考文献56

  • 1蒋东旗,郝玉龙,陈云敏.远场地震作用下桩间横向动力相互作用的研究[J].地震工程与工程振动,2004,24(4):170-176. 被引量:7
  • 2牛志荣,杨桂通.冲击荷载下土体位移特征研究[J].岩土力学,2005,26(11):1743-1748. 被引量:25
  • 3高江平,俞茂宏,胡长顺,陈忠达.加筋土挡墙滑动破裂面的大型模型试验[J].长安大学学报(自然科学版),2005,25(6):6-9. 被引量:31
  • 4.中华人民共和国交通部标准:公路加筋土工程设计及施工规范汇编[S].北京:人民交通出版社,1993.27~28.
  • 5.中华人民共和国铁道部标准: 铁路路基结构物设计规范[S].北京:中国铁道出版社,2001.31~38.
  • 6JTS 167-3-2009板桩码头设计与施工规范[S].
  • 7Koseki J.,Bathurst R.J.,Güler E.,et al.Seismic stability of reinforced soil walls[C]//Proceedings of International Conference 8th Geosynthet-ics.Yokohama,Japan:2006,18-22.
  • 8Tatsuoka F.,Tateyama M.,Koseki J.and et al.Geotextile-reinforced soil retaining wall and their seismicbahaviour[C]//Proc.of 10th Asian Re-gional Conf.on Soil Mechanics and Foundation Engineering,Beijing,1995,26 -49.
  • 9Bathurst R.J.,Cai Z.Pseudo-static seismic analysis of geosynthetic reinforced segmental retaining walls[J].Ceosynthetics International,1995,2 (5):789-832.
  • 10Race R.,Cid H.Seismic performance of modular block retaining wall structures during the January 2001 El Salvador earthquake[C]//International Geosynthetics Engineering Forum,Taipei,Taiwan (CD-ROM),2001.

共引文献77

同被引文献22

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部