GIS隔离开关开合母线充电电流试验方法探析 被引量:2

Discussion and Analysis of Current Test Method of GIS Disconnector Switching Bus-charging
下载PDF
导出
摘要 分析了GIS中快速暂态过电压VFTO产生的原因及危害,阐述了GIS隔离开关开合母线充电电流试验回路、试验方法及标准要求。介绍了测量VFTO波形的内置圆盘电极及高速数据测量系统,探讨了相关测量技术指标和要求,并针对试验中需要注意问题给出了建议。 The causes and hazards of Very Fast Transient Over-voltage(VFTO)in GIS was analyzed.The test circuit,test method and standard requirements for the Disconnector Switching(DS)Bus-charging current switching test were elaborated.The built in disc electrode and high speed data acquisition system for measuring VFTO waveform were introduced.Relevant measuring technical specification and requirements were discussed.The problems that should be paid attention to in the experiment were briefly analyzed and specific suggestions were given.
作者 李华良 孙敏 王博 王乐 赵红伟 庞明明 邵云峰 刘永强 LI Hualiang;SUN Min;WANG Bo;WANG Le;ZHAO Hongwei;PANG Mingming;SHAO Yunfeng;LIU Yongqiang(China Qiyuan Engineering Corporation,Xi′an 710018,China;School of Electrical Engineering,Xi′an Jiao Tong University,Xi′an 710018,China;Xi′an High Voltage Apparatus Research institute Co.,Ltd.,Xi′an 710018,China;State Grid Lvliang Power Supply Company,Lvliang 033000,China)
出处 《电工技术》 2018年第21期150-153,共4页 Electric Engineering
关键词 GIS手孔 快速暂态过电压 瞬态外壳电压 测量系统 GIS access port VFTO TEV measuring system
  • 相关文献

参考文献9

二级参考文献97

共引文献276

同被引文献16

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部