大型发电厂启备变带公用负荷接线方式改造经济性探讨

Discussion onReforming Economy ofImprovement of Wiring of Start-up and Standby Transformerwith Public Load in Large-scale Power Plant
下载PDF
导出
摘要 网厂分家后,电厂启备变用电按大工业用户用电进行收费。为提高电厂经济效益,对用电系统进行调整和改造,启备变带公用负荷接线方式厂用电深度进行优化,启备变改热备用方式。综合改造费用、改造前后厂用电量及费用,启备变改热备用方式运行后,厂用电量降低35%以上,整体节约费用近200万元,经济性显著。 After the grid and the power plant are separated,the power consumption of start-up and standby transformerwas charged by large industrial users.In order to improve the economic efficiency of power plants,the electricity system was adjusted and improved.The wiring of start-up and standby transformer with public load was optimized.The hot standby mode was used.Integrated renovation costs,plant electricity consumption and costs before and after renovation,after the start-up standby transformer turn into hot standby,plant power consumption reduced more than 35%and the overall cost savings of nearly 2 million.The economy was significant.
作者 杨凯 李高 傅宁涛 YANG Kai;LI Gao;FU Ningtao(Guangdong Yudean Group Co.,Ltd.,Zhanjiang Electric Power Co.,Ltd.,ZhanJiang 524000,China)
出处 《电工技术》 2018年第19期122-124,共3页 Electric Engineering
关键词 启备变 热备用 接线方式 成本 start-up and standby transformer hot standby wiring cost
  • 相关文献

参考文献10

二级参考文献25

  • 1王金芝,江荣汉,李德生,邱仕义,吴志强,龚德安.配电系统可靠性数据统计与分析[J].湖南大学学报(自然科学版),1994,21(2):91-97. 被引量:9
  • 2马宏忠,臧芳,张利民,王惠庆.异步电动机失电残余电压的防范与应用[J].大电机技术,2005(2):17-20. 被引量:13
  • 3李瑞生,王义平,熊章学,姚晴林.厂用电快速切换应用与研究[J].继电器,2005,33(10):79-81. 被引量:9
  • 4叶念国.抑制变压器励磁涌流的新方法[C].//中国电力系统保护与控制学术研讨会论文集.2006:767-772.
  • 5保定天威保变电气股份有限公司.电力变压器手册.机械工业出版社,2003.
  • 6火力发电厂设计技术规程.中华人民共和国国家经济贸易委员会.
  • 7世界银行.美国加州电力改革与电力危机:发展中国家电力市场应汲取的教训[R].国务院体改办研究所,2001.
  • 8GB/T 14285-2006 继电保护和安全自动装置技术规程.2006.
  • 9DL/T5153-2002火力发电厂厂用电设计技术规定[J].中国电力出版社,2002,8.
  • 10深圳市智能设备开发有限公司.SID-3YL型涌流抑制器使用说明书(7.041版)[J].2007,4.

共引文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部