摘要
通过对宁德水闸工程概况及施工条件的分析,从主体下部工程工期紧和施工组织管理困难两方面着手,对宁德水闸的施工组织设计工作的重难点展开研究,并在此基础上提出具体的解决建议,希望可以为组织设计相关工作的开展提供参考。
Based on the analysis of the general situation and construction conditions of Ningde sluice project,this paper studies the key and difficult points of the construction organization design of Ningde sluice from the two aspects of the tight construction period of the lower part of the main body project and the difficulty of construction organization and management,and puts forward concrete solutions on this basis,hoping to be able to organize and design related projects.Provide reference for development.
作者
杨永建
李海洋
Yang Yongjian;Li Haiyang(China Water Conservancy and Hydropower Eleventh Engineering Bureau Co.,Ltd,Zhengzhou 450000,China)
出处
《山西建筑》
2018年第35期209-210,共2页
Shanxi Architecture
关键词
水闸工程
施工条件
组织设计
sluice engineering
construction condition
organization design