期刊文献+

某船厂切割车间基于TOC的作业计划问题研究

Research on Job Shop Scheduling Problem Based on TOC in a Shipyard Cutting Shop
下载PDF
导出
摘要 本文在调查某船厂切割加工车间作业计划现状的基础上,应用TOC原理对车间生产计划进行优化,并与现有作业计划进行对比,得出约束理论在船舶制造企业作业计划制定中,具有一定的可行性和优越性。本文对船舶制造企业应用约束理论提高企业竞争力有一定的指导意义。 Based on the investigation of the current situation of the operation plan of a shipyard’s cutting and processing workshop,this paper optimizes the workshop production plan by applying the TOC principle and compares it with the existing operation plan.It is concluded that the constraint theory has certain certainty in the shipbuilding enterprise operation plan formulation.Feasibility and superiority.This paper has certain guiding significance for shipbuilding enterprises to apply the constraint theory to improve the competitiveness of enterprises.
作者 岳若飞 YUE Ruofei(Connectivity Equipment Group Limited,Ningbo 315830)
出处 《现代制造技术与装备》 2018年第11期106-106,109,共2页 Modern Manufacturing Technology and Equipment
关键词 作业计划 约束理论 DBR scheduling theory of Constraints DBR
  • 相关文献

参考文献2

二级参考文献4

  • 1Duwwayri, Z.; Mollaghasemi, M.. Scheduling setup changes at bottle neck facilities in semiconductor manufacturing. Simulation Conference,9 - 12 Dec. 2001, vol. 2:1208 - 1214.
  • 2谢连升.[D].南京:南京航空航天大学,2003.
  • 3潘家邵,曹德弼.现代生产管理学[M].北京:清华大学出版社,2003.
  • 4何静,徐福缘.供应链瓶颈问题分析及其解决方法[J].计算机集成制造系统-CIMS,2003,9(2):122-126. 被引量:14

共引文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部