摘要
通过不同施工阶段、不同荷载形式,对高桩码头水上施工平台的主梁、次梁及牛腿等进行了受力计算,其强度、刚度及安全性能均满足规范及使用要求,保证了平台的安全性与稳定性。钢平台的搭设,确保了钻孔嵌岩灌注桩及其上部结构的顺利施工。
Through different construction stages and different load forms,the stress calculation of the main beam,secondary beam and bracket of overwater construction platform of the high-pile wharf are carried out.The strength,stiffness and safety performance of the platform meet the specifications and application requirements,and the safety and stability of the platform are guaranteed.The setting up of the steel platform ensures the smooth construction of rock socketed pile and its upper structure.
作者
殷立中
刘文
YIN Li-zhong;LIU Wen(CCCC Tianjin Harbor Engineering Co.,Ltd.,Tianjin 300456,China)
出处
《水运工程》
北大核心
2018年第A01期80-82,共3页
Port & Waterway Engineering
关键词
高桩码头
嵌岩灌注桩
平台设计
结构计算
high piled wharf
rock socketed pile
platform design
structural calculation