期刊文献+

BIM技术在航道建设中的作用 被引量:20

Role of BIM technology in waterway construction
下载PDF
导出
摘要 航道工程具有施工工期长、施工影响因素多等特点。在航道工程的设计、施工、维护的各个阶段,随着对精细化管理的需求日趋提高,传统的实施方法已不能满足工程的强度与精度要求。从航道工程和BIM的特性入手,探讨了BIM技术在航道工程设计、施工、维护等各阶段的应用。在保证设计合理性的前提下,可通过BIM模型完成设计意图的表达与传递,从而保证航道工程的施工质量,以及后续维护阶段航道整治建筑物安全、稳定地发挥其作用。 The waterway project has the characteristics of long construction period and many affecting factors.In the various stages of design,construction and maintenance of waterway engineering,with the increasing demand for refined management,the traditional implementation methods cannot meet the strength and precision requirements of the project.This paper starts with the characteristics of waterway engineering and BIM,and discusses the application of BIM technology in the design,construction and maintenance of waterway engineering.On the premise of ensuring the rationality of the design,the expression and transmission of the design intention can be completed through the BIM model,so as to guarantee the construction quality of the waterway engineering and to play its role in the security and stability of the waterway regulation buildings in the subsequent maintenance stage.
作者 郭涛 GUO Tao(Changjiang Waterway Planning,Design and Research Institute,Wuhan 430040,China)
出处 《水运工程》 北大核心 2018年第12期21-25,共5页 Port & Waterway Engineering
关键词 BIM技术 航道工程 设计 施工 维护 三维GIS平台 BIM waterway engineering design construction maintain 3D GIS plateform
  • 相关文献

参考文献4

二级参考文献22

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:108
  • 2张昆.基于BIM应用的软件集成研究[J].土木建筑工程信息技术,2011,3(1):37-42. 被引量:28
  • 3过俊.BIM在国内建筑全生命周期的典型应用[J].建筑技艺,2011(1):95-99. 被引量:141
  • 4Eastman C,Teicholz P,Sacks R. BIM handbook[M].New Jersey:John Wiley and Sons,Inc,2010.
  • 5Yang D,Eastman C M. A rule-based subset generation method for product data models[J].Computer-Aided Civil and Infrastructure Engineering,2007,(02):133-148.doi:10.1111/j.1467-8667.2006.00476.x.
  • 6Singh V,Gu N,Wang X. A theoretical framework of a BIMbased multi-disciplinary collaboration platform[J].Automation in Construction,2011,(02):134-144.
  • 7Liu Qiang,Zhang Jianping,Li Ding. Research of building information modeling and model transformation technology based on the IFC[A].2012.
  • 8Zhang Jianping,Hu Zhenzhong. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety prohlems during construction: 1 principles and methodologies[J].Automation in Construction,2011.155-166.
  • 9Hu Zhenzhong,Zhang Jianping. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction:2.development and site trials[J].Automation in Construction,2011.167-180.
  • 10Liang Xiong,Lu Ming,Zhang Jianping. Integration of as-built and as-designed models for positioning control during construction[J].Automation in Construction,2011,(03):234-246.

共引文献1227

同被引文献127

引证文献20

二级引证文献71

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部