期刊文献+

抽水蓄能电站工程质量检测管理探析 被引量:2

Analysison project quality inspection and management in pumped storage power station
下载PDF
导出
摘要 本文以如何提高质量检测管理水平为主线,分析了抽水蓄能电站工程质量检测管理现状。针对存在的问题,梳理管理流程和要点,并从质量检测分标规划、类型选择、结算方式、招标工程量控制、现场实验室验收、试验过程控制和不合格品的处理等环节提出改进措施,以期为提高抽水蓄能电站质量检测管理水平提供借鉴。 How to improve the quality inspection and management level is regarded as the main line in the paper.The status quo of quality inspection and management in pumped storage power station engineering are analyzed.Management flow and keys are carded in view of existing problems.Improvement measures are proposed from aspeets such as quality detection bid division planning,type selection,paymentmethod,tender engineering quantity control,field laboratory acceptance,test process control andnon-conforming product treatment,etc,thereby providing reference for improving quality detection management level in pumped storage power station.
作者 王海波 曹可佳 郭凯 WANG Haibo;CAO Kejia;GUO Kai(Engineering Construction Management Branch of Peak-frequency Modulation Power Generation Company,Guangzhou 510000, China)
出处 《水利建设与管理》 2018年第12期45-48,共4页 Water Conservancy Construction and Management
关键词 抽水蓄能电站 质量检测 管理模式 质量控制 pumped storage power station quality inspection management mode quality control
  • 相关文献

二级参考文献2

  • 1刘鲁强.加强质量检测,全面促进提高水电建设建设工程质量[A].全区水利水电工程质量监督检测工作会议交流材料[c].南宁:广西水利科学研究所,1995.
  • 2丁凯,曹征齐.水利水电工程质量检测人员从业资格考核培训系列教材[M].北京:中国水利协会,2008.

共引文献37

同被引文献8

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部