封闭厂房高位基础压缩机组撬块安装工艺

Skid-mounted compressor unit installation on tall base in closed workshop
下载PDF
导出
摘要 在哈萨克斯坦PKOP奇姆肯特炼油厂老厂区装置升级改造中,其封闭厂房内部增加了一套压缩机系统,压缩机组撬块需安装在高位基础上,由于厂房结构无法破坏,施工存在难点。研究确定采用滑道将压缩机组撬块滑移至厂房内,并利用厂房内部起重机横梁作为提升点,手动葫芦配合,将压缩机组撬块提升,最后使用起重机水平行走机构,将压缩机组撬块移动至基础位置进行安装就位。实践表明,该工艺较好地解决了上述施工难题。详细介绍了滑道铺设、撬块滑移、撬块提升、撬块水平移动以及撬块就位过程。此安装工艺为今后封闭厂房内安装此类设备提供了经验。 In upgrading equipment of the old factory area of Kazakhstan PKOP Shemkent Refinery,a new skid-mounted compressor unit is needed to install on a tall base in the closed workshop,the construction faces difficulty because the construction must not damage the closed workshop structure.The following construction process is adopted after research:using slideway to move the compressor unit into the workshop,using workshop crane and manual chain block to move the compressor unit on the tall base and install it.The slideway laying,skid-mounted compressor unit sliding,lifting,horizontal moving and installing are described in detail.
作者 庞学龙 PANG Xuelong(PetroChina Seventh Construction Company,Qingdao 266300,China)
出处 《石油工程建设》 2018年第6期66-67,70,共3页 Petroleum Engineering Construction
关键词 封闭厂房 压缩机组 安装 closed workshop compressor unit installation
  • 相关文献

参考文献3

二级参考文献3

  • 1HG/T21574-1994,设备吊耳[S].
  • 2SH3536-2002,石油化工工程起重施工规范[S].
  • 3GB50017-2003.钢结构设计规范[S].[S].,..

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部