期刊文献+

冀东油田海洋钢桩海生物附着危害分析及应对措施 被引量:2

Hazard analysis and countermeasures of marine organism attachment to marine steel piles in Jidong Oilfield
下载PDF
导出
摘要 海洋附着生物对海洋油气生产结构物影响很大,主要危害是增大平台桩腿的体积和表面粗糙度,腐蚀海洋石油平台结构,影响潜水员的水下作业等。通过对位于渤海湾冀东油田人工岛登陆点的700多根海洋钢桩的外观检测,给出了海洋钢桩的海生物附着情况,分析了海生物生长机理及规律,论述了海生物附着对海洋油气生产的危害,介绍了采用涂装防污涂料、电解防污、超声波防污及机械防污等技术抑制和清除海洋钢桩海生物的方法,最后根据油田的现实情况提出了相应的应对措施。 The main hazards of marine organism attachment to offshore oil and gas production structures include increasing platform pile volume and surface roughness,corroding platform structure,affecting diver operation,and so on.Based on the appearance inspection of more than 700 marine steel piles in the artificial island landing structure in Jidong Oilfield in Bohai Bay,this paper presents the situation of marine organism attachment to those steel piles,analyzes the growth mechanism of marine organism attachment and its hazard to marine oil and gas production,introduces the antifouling methods to inhibit and clean the marine organism attachment,such as using antifouling paint,electrolysis,ultrasonic waves and mechanical means.Finally,according to the actual situation of the oilfield,the corresponding countermeasures are put forward.
作者 李祥银 代兆立 张彦军 张传隆 刘进鹏 LI Xiangyin;DAI Zhaoli;ZHANG Yanjun;ZHANG Chuanlong;LIU Jinpeng(Nanpu Operating Area of Jidong Oilfield,Tangshan 063200,China;CNPC Engineering Technology Research Company Limited,Tianjin 300451,China)
出处 《石油工程建设》 2018年第6期68-70,共3页 Petroleum Engineering Construction
关键词 海洋钢桩 海生物附着 应对措施 冀东油田 marine steel pile marine organism attachment countermeasure Jidong Oilfield
  • 相关文献

参考文献2

二级参考文献34

共引文献11

同被引文献22

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部