期刊文献+

浅谈双塔水库除险加固项目技术难点处理分析

Analysis on Technical Difficulty Treatment in Reinforcement Project of Shuangta Reservoir
下载PDF
导出
摘要 甘肃省双塔水库除险加固项目建设过程中,各子项目之间存在一定关联,环环相扣,互相制约,上一个项目完成后才能进行下个项目施工,子项目施工难度较大。文章从技术上分析了各关键点的衔接、子项目难点处理的解决途径,为项目建设按期高质量完成创造了条件,为今后类似工程建设积累了大量经验。 There is certain correlation among sub-projects in the construction process of Shuangta reservoir reinforcement project in Gansu Province,which are interlocking and restricted mutually.The construction of the next project cannot be carried out until the last project is completed.The construction of the sub-projects is very difficult.The connection of all key points and the solution of difficulty treatment among sub-projects are analyzed technically in the paper,thereby creating conditions for high-quality completion of the project on schedule,thereby accumulating a lot of experience for constructing similar projects in the future.
作者 李晓东 王平 LI Xiaodong;WANG Ping(Gansu Shule River Basin Water Resources Administration, Jiuquan 736100, China)
出处 《中国水能及电气化》 2018年第12期16-20,35,共6页 China Water Power & Electrification
关键词 双塔水库 除险加固 技术难点 处理分析 Shuangta Reservoir reinforcement technical difficulties treatment analysis
  • 相关文献

参考文献5

二级参考文献23

共引文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部