摘要
甘肃省双塔水库除险加固项目建设过程中,各子项目之间存在一定关联,环环相扣,互相制约,上一个项目完成后才能进行下个项目施工,子项目施工难度较大。文章从技术上分析了各关键点的衔接、子项目难点处理的解决途径,为项目建设按期高质量完成创造了条件,为今后类似工程建设积累了大量经验。
There is certain correlation among sub-projects in the construction process of Shuangta reservoir reinforcement project in Gansu Province,which are interlocking and restricted mutually.The construction of the next project cannot be carried out until the last project is completed.The construction of the sub-projects is very difficult.The connection of all key points and the solution of difficulty treatment among sub-projects are analyzed technically in the paper,thereby creating conditions for high-quality completion of the project on schedule,thereby accumulating a lot of experience for constructing similar projects in the future.
作者
李晓东
王平
LI Xiaodong;WANG Ping(Gansu Shule River Basin Water Resources Administration, Jiuquan 736100, China)
出处
《中国水能及电气化》
2018年第12期16-20,35,共6页
China Water Power & Electrification
关键词
双塔水库
除险加固
技术难点
处理分析
Shuangta Reservoir
reinforcement
technical difficulties
treatment analysis