摘要
针对江苏省河湖和水利工程管理范围划定工作,从划界工作内容、必备的基础数据、划定工作中的控制测量、地形修测、管理范围划定过程中的基准线确定、界桩布置和放样、河道管理范围线图编制、成果整理和信息化,后期抽检和综合检查等方面提出研究思路和技术方法,为测绘单位实施河湖划界工作提供借鉴。
Aiming at the delimitation of river and water conservancy project management scope,we described the research ideas and technical methods of delimitation work content,essential basic data,control survey,topographic repair,determination of datum line,markers construction layout,drafting the maps of river and water conservancy project management scope,achievements collation and informatization,check and comprehensive examination.This study can provide a reference for surveying and mapping unit working at delimitation work.