自升式钻井平台悬臂梁接长改造工程实践

Lengthened Cantilever Renovation Project Practices for Jack-up Drilling Unit
下载PDF
导出
摘要 以某自升式钻井平台悬臂梁改造工程为例,阐述此改造工程从实际生产需求分析、改造目标确定、方案研究及形成相关技术路线、船厂施工到出厂后作业的整个流程,详细介绍悬臂梁改造接长对平台产生的一系列连锁影响和所需采取的应对措施,对其他海洋工程装备的改造具有一定指导意义。改造工程的成功实施为作业者带来巨大的经济收益。 Based on an actual cantilever renovation project for a jack up drilling platform,the whole process from analysis of actual production requirements,determining the reform goals,plan study and technical route,shipyard construction to operation after renovation is mentioned.A series of knock on effects to jack up by cantilever renovation and response measures are introduced in detail,which may be helpful to the renovation of other marine engineering equipments.The successful renovation brings huge economic benefits to operators.
作者 李红涛 徐辉 LI Hongtao;XU Hui(Offshore Engineering Technology Center of CCS, Tianjin 300457, China)
出处 《中国海洋平台》 2018年第6期85-90,共6页 China offshore Platform
关键词 自升式平台 悬臂梁 海洋工程装备 jack up unit cantilever marine engineering equipment
  • 相关文献

参考文献3

二级参考文献46

  • 1廖谟圣.三论我国海洋石油工业技术装备之国产化[J].中国海洋平台,2004,19(4):1-7. 被引量:9
  • 2丁果林,徐捷.JU2000自开式钻井平台桩腿建造检验[J].中国船检,2005(11):86-88. 被引量:12
  • 3Atwood Oceanics Inc. http://www. atwd. com
  • 4Choo Y S. Recent development and innovation in tubular structures [J]. Advances in Structural Engineering, 2005(3).
  • 5SNAME. Guidelines for Site Specific Assessment of Mobile Jack-up Units[S]. Technical & Research Bulletin 5-5A, Revision 2, January 2002.
  • 6Smith S F, et al. 3D nonlinear wave spreading on jackup loading and response and its impact on current assessment practice[A]. OTC[C], 2006:1- 13.
  • 7Offshore Magazine, 2004(4).
  • 8LeTourneau. http://www.letourneau-inc. com
  • 9....Friede & Goldman (友人与金人)http://www. fng. com,,..
  • 10BASS. http://www. bbengr. com

共引文献164

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部