箱涵顶进施工中沉降与定位技术研究 被引量:2

Study on settlement and location technology in box culvert jacking construction
下载PDF
导出
摘要 以太原市某下穿铁路框架桥箱涵顶进施工为例,对箱涵顶进施工中的沉降与定位问题进行深入分析,并通过布控沉降量监测网、实时定位分析、数值模拟规律等技术跟踪施工进程,确保地上既有铁路不受影响。 Taking the jacking construction of box culvert of a certain underpass rail-way frame bridge in Taiyuan as an example,the settlement and positioning problems in the jacking construction of box culvert are analyzed in depth,and the construction process is tracked through the monitoring network of settlement,real-time positioning analysis and numerical simulation la-w,so as to ensure that the existing rail-ways on the ground are not affected.
作者 曹勇 Cao Yong(Shuozhou Road and Bridge Construction Co. ,Ltd,Shuozhou 036000 , China)
出处 《山西建筑》 2018年第36期164-165,共2页 Shanxi Architecture
关键词 箱涵顶进 沉降监测 实时定位 box culvert jacking settlement monitoring real time location
  • 相关文献

参考文献4

二级参考文献23

  • 1徐洪钟,李雪红.基于Logistic增长模型的地表下沉时间函数[J].岩土力学,2005,26(S1):151-153. 被引量:29
  • 2崔党群.Logistic曲线方程的解析与拟合优度测验[J].数理统计与管理,2005,24(1):112-115. 被引量:212
  • 3肖世国,夏才初,朱合华,李向阳,刘学增.管幕内箱涵顶进中顶部管幕竖向变形预测[J].岩石力学与工程学报,2006,25(9):1887-1892. 被引量:18
  • 4孙旻,徐伟.软土地层管幕法施工三维数值模拟[J].岩土工程学报,2006,28(B11):1497-1500. 被引量:21
  • 5Philip J C, David G A, Microtunneling techniques to form an in-situ barrier around existing structures [ A /! High Level Radioactive Waste Management-Proceedings of the Annual International Con-ference [ C ]. Las Vegas: Is. n.], 1994: 386-394.
  • 6Musso G. Jacked pipe provides roof for underground construction in busy urban area[ J]. Civil Engineering, 1979: 49(11) : 79-82.
  • 7Bito Y. Construction methods of the structures passing through under railway line [ J ]. Japanese Railway Engineering, 1987, 4(26) : 6-9.
  • 8Tan W L, Ranjith P G. Numerical analysis of pipe roof reinforcement in soft ground tunneling [ A ]//In Proceedings of the 16 Imernational Conference on Engineering Mechanics[ C ]. ASCE. Seattle USA, 2003.
  • 9大谷達彦,進士正人,千々和辰訓.地表面沈下抑制 効果を考慮したパイプルーフの設計法[J].トンネ ノレと地下,2010, 41(5) : 383-393.
  • 10土井勇介,大谷達彦,進士正人?粒状体解析を用い た先受け工法の通切な綱管間隔に関する検討 [J].隧道工程(日本土木学会),2009,19:219- 224.

共引文献14

同被引文献11

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部