摘要 CAP1400是我国在引进消化AP1000的基础上自主研发的大型非能动压水堆核电站,其安全系统采用非能动设计理念,由自然力/过程来驱动,在事故工况下执行安全功能时无需外部动力电源。相对于现有商用压水堆核电站采用的能动安全系统,非能动安全系统的设计原理发生了根本变化,两者的事故进程与物理现象也存在很大差异。此外,CAP1400较AP1000具有更高的堆芯功率,因此,CAP1400安全评审要求对非能动安全系统开展试验验证。本文对CAP1400非能动堆芯冷却系统性能验证试验台架ACME进行介绍。相比原有AP600/1000开展的试验,ACME台架的试验参数范围更广,测量更加精细。通过试验结果及分析,研究了非能动堆芯冷却系统的事故响应特性及关键物理现象,为CAP1400的安全评审及相关安全分析程序验证提供了重要的试验结果支撑。 CAP1400 has been developed as a new passive safety power generation III+reactor based on AP600/1000 technology.The safety system of CAP1400 is driven by natural force or process.Compared with existingcommercial PWR,the design of passive safety system has changed a lot as well as the accident process andphysical phenomenon.The core power of CAP1400 is much bigger than AP1000.Therefore,verification experi-ments of passive safety system are required by CAP1400 safety review.A large-scale integrated test facility AC-ME was designed and built to achieve the PXS test verification of CAP1400.The parameter range and simula-tion similarity are improved compared to previous passive system tests of AP600/1000.Based on test results andanalysis,accident response and critical physical phenomenon are studied and relevant relations are improved,providing support of test results to CAP1400 safety review and related safety analysis code validation.
作者 常华健 李玉全 钟佳 房芳芳 石洋 王楠 张鹏 CHANG Hua-jian;LI Yu-quan;ZHONG Jia;FANG Fang-fang;SHI Ying;WANG Nan;ZHANG Peng(State Nuclear Power Technology R&D Center,Beijing 102209,China;INET Tsinghua University,Beijing 100084,China)
出处 《中国核电》 2018年第4期457-461,共5页 China Nuclear Power
基金 国家科技重大专项项目(大型先进压水堆及高温气冷堆核电站No.2017XZ060004002-006-004)
关键词 非能动安全 热工水力试验 CAP1400 安全评审 passive safety thermal hydraulic experiment CAP1400 safety review
  • 相关文献

参考文献1

二级参考文献13

  • 1Nuclear Regulatory Commlsslon. Vmal satety e- valuation report related to certification of the AP1000 standard design (NUREG-1793)[R/ OL]. USA: Nuclear Regulatory Commission, 2004[2010-07-08]. http://www, nrc. gov/read- ing-rm/doc-collection s / n uregs/ staff/ sr17 9 3 / cha- pter21, pdf.
  • 2LOUIS M S, YUTAKA K. Implication of the ROSA/AP600 high- and intermediate pressure test results[J]. Nuclear Technology, 1997, 199 (3) : 217-233.
  • 3REYES N J, LAWRENCE H. Scaling analysisfor the OSU AP600 test facility (APEX)[J]. Nuclear Engineering and Design, 1998, 186(1- 2) : 53-109.
  • 4秦本科,李玉全,张子扬,等.非能动堆芯冷却系统整体性能试验台架比例设计报告[R].北京:国家核电技术研发中心,2010.
  • 5REYES N J, WU Q, KING B J. Scaling assess- ment for the design of the OSU APEX-1000 test facility, OSU-APEX-03001 [R] n. 7, 2003.
  • 6KOCAMUSTAFAOGULLARI G, ISHII M. Scaling of two-phase flow transients using re- duced pressure system and stimulant fluid [J].Nuclear Engineering and Design, 1987, 104(2) 121-132.
  • 7ISHII M, KATAOKA I. Scaling laws for ther- mal-hydraulic system under single phase and two- phase natural circulation[J]. Nuclear Engineer- ing and Design, 1984, 81(3): 411-425.
  • 8ISHII M, REVANKAR S T, LEONARDI T, et al. The three-level scaling approach with applica- tion to the Purdue University multi-dimensional integral test assemble (PUMA)[J]. Nuclear En- gineering and Design, 1998, 186(1-2): 177-211.
  • 9Westinghouse. Low-pressure integral systemstest facility scaling report, WCAP-14270 [R]. Pittsburgh: Westinghouse Electric Coporation, 1997.
  • 10SCHWARTZBECK R K, KOCAMUSTAFAOGU- LLARI G. Similarity requirement for two-phase flow-pattern transitions[J]. Nuclear Engineering and Design, 1989, 116(2): 135-147.

共引文献15

同被引文献18

引证文献3

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部