摘要
分析统计了8个水电站近3年的经营成本资料,按照设计阶段经营成本测算参数对各水电站经营成本进行了测算,将二者对比分析,找出差距并提出建议。
The operating cost data of eight hydropower stations in recent three years are analyzed and counted.The operating cost of each hydropower station is calculated according to the calculation parameters of operating cost in the design stage.Using comparative analysis,the difference between the two is found and suggestions are put forward.
作者
王旭辉
WANG Xuhui(PowerChina Guiyang Engineering Corporation Limited, Guiyang, Guizhou, 550081)
出处
《红水河》
2018年第6期46-48,共3页
Hongshui River
关键词
水电站
经营成本
修理费
hydropower station
operating cost
repair cost