摘要
对洪家渡发电厂2号机组同期失败原因进行查找和分析,并提出有效处理方法,通过实施后,解决了洪家渡发电厂机组同期失败问题,提高机组同期并网成功率,消除了"远程集控,少人维护""无人值班"水电厂的一大安全隐患。
The causes of unit2synchronization failure in Hongjiadu Power Plant are searched and analyzed,and effective treatment methods are put forward.After implementation,the problem of unit synchronization failure in Hongjiadu Power Plant is solved,the grid-connected success rate of unit synchronization is improved,and a great safety hidden of“remote centralized control,less maintenance”and“unmanned”hydropower plant is eliminated.
作者
李安兴
LI Anxing(Hongjiadu Power Plant of Guizhou Wujiang Hydropower Development Co., Ltd., Bijie, Guizhou, 551501)
出处
《红水河》
2018年第6期111-114,118,共5页
Hongshui River
关键词
水轮发电机组
同期装置
并网
洪家渡发电厂
hydraulic turbine generator unit
synchronization device
grid connection
Hongjiadu Power Plant