基于工业工程的集装箱后端框装配线的平衡 被引量:8

Balance on Container Back Frame Assembly Line Based on Industrial Engineering
下载PDF
导出
摘要 装配生产线是制造业中常见的一种生产作业形式,其效率直接影响整个生产线的生产效率。针对某集装箱公司后端框装配生产线的实际状况,以实际测定工时为据,找出瓶颈工序。运用工业工程方法对装配生产线进行分析改善,并利用Flexsim仿真软件对改善方案进行效果评价。结果表明,装配线平衡率由改善前的76. 2%提高到90. 4%,单日最大产能为225件,较改善前的产能提高了38件,减少了作业时间浪费,进而提高了产线效率。 Assembly line is a common form of production in manufacturing enterprises,and the efficiency of assembly line directly affects the production of the whole production line.According to the actual working hours,the assembly line of the container back frame is analyzed to find the bottleneck process.The basic industrial engineering method is used to solve the balance problem in the production line.And the effectiveness of the improvement is evaluated by Flexsim simulation software.The results show that the balance rate of assembly line is increased from76.2%to90.4%,the maximum productivity is225per day which increased by38.Thus,the waste of operation time is reduced,and the efficiency of line production is improved.
作者 杨昆 任思达 李佳明 谢陈华 YANG Kun;REN Si-da;LI Jia-ming;XIE Chen-hua(Faculty of Mechanical Engineering and Automation, Liaoning University of Technology, Jinzhou 121000, China)
出处 《科学技术与工程》 北大核心 2018年第35期140-144,共5页 Science Technology and Engineering
基金 辽宁省教育厅高校重大科技平台项目(JP20160008) 辽宁省教育厅一般项目(L2015241)资助
关键词 后端框 生产线平衡 工业工程 FLEXSIM back frame line balancing industrial engineering Flexsim
  • 相关文献

参考文献5

二级参考文献24

  • 1孙建华,高广章,蒋志强.生产线平衡的手段与方法研究[J].成组技术与生产现代化,2004,21(4):34-36. 被引量:63
  • 2兰秀菊,陈勇,汤洪涛.SMT生产线平衡的持续改善方析[J].工业工程与管理,2006,11(2):109-111. 被引量:49
  • 3刘晋浩,侯东亮.装配线平衡问题的求解方法浅析[J].森林工程,2006,22(4):21-23. 被引量:19
  • 4陈荣秋 马士华.生产与运作管理[M].北京:高等教育出版社,2002..
  • 5易树平,郭伏.基础工业工程[M].北京:机械工业出版社,2007.
  • 6Meyers F E,StephensM P. Manufacturing Facilities Designand Material Handling[ M ].2ndEdition.NY: Prentice-Hal, lInc., 2000.
  • 7G Salvendy.Handbook of Industrial Engineering:Technology and Operati- ons Management [ M ].3rd ed. New York : Wiley-lnterscience, 2001.
  • 8Tag Gon Kim.Theory of Modeling and Simulation:integrating discrete event and continuous complex dynamic System [M].San Diego,CA : Academic Press, 2000.
  • 9Li Yue.Improvement and research of lean production in car-seat assembly line[J].Advanced Materials Research,2013(601):415-419.
  • 10陈勇,汤科峰,林飞龙,刘春艳.企业CD段流水线的瓶颈分析与平衡改善[J].工业工程与管理,2008,13(1):112-115. 被引量:23

共引文献54

同被引文献67

引证文献8

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部