摘要
工程量清单计价法是我国目前建设工程的一种计价方法,招标工程量清单作为招标文件的组成部分,是工程量清单计价的基础,编制招标控制价、投标报价、计算或调整工程量、索赔等的依据之一,招标控制价作为招标工程的最高限价,其准确性和正确性,影响投标报价和实际造价,加强工程量清单与控制价审核意义重大。
The bill of quantities valuation method is a valuation method of construction projects in our country at present.As a part of tender documents,the bill of quantities is the basis of the bill of quantities valuation and is one of the basis for compiling the bidding control price,bidding price,calculation or adjustment of engineering quantity,claim,etc..The bidding control price is the maximum price of the bidding project and its accuracy and correctness affect the bidding price and actual cost.It is of great significance to strengthen the auditing of the bill of quantities and control price.