期刊文献+

铁路隧道无配筋二衬早期裂缝的控制实践 被引量:1

Control Practice of Early Cracks in Non-reinforcing Secondary Lining of Railway Tunnels
下载PDF
导出
摘要 混凝土开裂的问题始终困扰着工程的使用和寿命,施工中如何控制混凝土早期裂缝的产生有着重要意义。在蒙华铁路MHTJ-17标双线隧道工程中,基于现有的技术工艺水平,通过理论分析与实践验证,准确判定二衬混凝土产生裂缝的各种因素,并优化施工组织措施,最终无配筋地段二衬早期裂缝得到有效控制和消除。希望为以后同类混凝土结构裂缝的产生和控制提供帮助。 The problem of concrete cracking always affects the use and life of the project.It is of great significance to control the early cracks in concrete during construction.In the MHTJ-17standard double-track tunnel project of Inner Mongolia-Jiangxi Railway,based on the existing technical level,through theoretical analysis and practical verification,it can accurately determine the various factors causing cracks in the secondary lining concrete,and optimize the construction organization measures.Early cracks in the secondary lining of the rib section are effectively controlled and eliminated.It is hoped to help the generation and control of cracks in similar concrete structures in the future.
作者 张进 ZHANG Jin(China Railway Sixth Group Co.,Ltd. Inner Mongolia-Jiangxi Railway MHTJ-17 Tender Section Project Manager,Xixia 474550,China)
出处 《价值工程》 2018年第34期135-137,共3页 Value Engineering
关键词 铁路隧道 无配筋 早期 裂缝 控制 实践 消除 railway tunnel no reinforcement early crack control practice elimination
  • 相关文献

同被引文献6

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部