针对传统管线碰撞存在的问题,设计完成后对施工图纸进行二次优化。在某建设项目中建立机电建筑信息模型(BIM),将模型导入分析软件中进行碰撞检查分析并对模型进行调整,从而在施工前解决设计中出现的"错、漏、碰、缺",避免施工过程中因设计错误而引发的返工、工期延误等问题。
In view of the problems existing in the traditional pipeline collision,the construction drawings are re-optimized while the design is completed.An electromechanical building information model(BIM)is stablished in a construction project,introducing the model into the analysis software for collision check and model adjust,so as to solve the“mistakes,leaks,bumps and defects”in the design before constructing,and avoid rework and delays caused by design errors during construction.