摘要
随着数字化矿山建设的逐步推广,国外矿山软件逐渐应用于国内矿山。简述了Micromine矿业软件原理,分析了利用传统地质手段在矿床勘探及矿山设计中存在的主要问题,并以长山壕金矿为工程背景,利用Micromine矿业软件解决传统地质手段在矿山设计中存在的问题。工程应用表明:原始地质资料的准确及对矿床成矿规律的正确认识是未来勘探及设计工作的前提;利用价格及企业生产成本作为杠杆,Micromine矿业软件与传统设计手段相结合,优化矿山设计,使之更贴合企业生产实际,实现企业经济效益最大化。
With the development of digital mine construction,foreign mining software is more and more used in domestic mines.The paper described the principles of Micromine mining software and analyzed main problems in using conventional geological means to explore deposits and do mine design;in the case study of Changshanhao Gold Mine,Micromine mining software is used,solving the problems conventional geological means have in mine design.Engineering application shows that the accuracy of primary geological data and proper understanding of ore-forming rules are the premises of future exploration and design;with price and production cost as leverage,Micromine mining software and conventional design means are combined,the mine design is optimized to better fit the production practice of enterprises,and the maximum economic benefits of enterprises are realized.
作者
姚树春
Yao Shuchun(Chagnchun Gold Designing Institute Co.,Ltd.)
出处
《黄金》
CAS
2018年第12期39-44,共6页
Gold