摘要
为了解决煤矿中央变电所配电装置在对电源进行控制中的可靠性问题,基于对当前煤矿中央变电所配电装置设计现状的研究,进一步提出了一种新型供电系统的设计思路与方案。经实践证明,采用新的供电系统,对中央变电所高压真空配电装置的优化有显著效果,使其更为可靠和准确。
In order to solve the reliability problem of power distribution equipment in coal mine central substation contro,based on the research on the current design status of power distribution equipment in the central substation of coal mines,the design ideas and schemes of a new power supply system were further proposed.It has been proved by practice that the new power supply system has a significant effect on the optimization of the high voltage vacuum power distribution device of the central substation,making it more reliable and accurate.
作者
王俊峰
WANG Jun-feng(Shanxi Gaoping Kexing Mishan Coal Industry Co.,Ltd.,Gaoping 048400,China)
出处
《机电工程技术》
2018年第12期169-171,共3页
Mechanical & Electrical Engineering Technology
关键词
煤矿
供电系统
中央变电所
配电装置
控制电源
断路器
coal mine
power supply system
central substation
power distribution device
control power supply