3Huang T, Kong C W, Guo H L, Baldwin A, Li H. A virtual prototyping system for simulating construction processes [J]. Automation in Construction, 2007, 16( 5 ): 576-585.
4Li H, Huang T, Kong C W, Guo H L, Baldwin A, Chan N, Wong J. Integrating design and construction through virttial prototyping[J]. Automation in Construction, 2008, 17 ( 8): 915-922.
5Li H, GUO H L, Skibniewski M J, Skitmore M. Using the IKEA model and Virtual Prototyping technology to improve construction process management[J]. Construction Management and Economics, 2008, 26 ( 9 ): 991-1000.
6Li H, Guo H L, Skitmore M, Huang T, Chan N, Chan G. Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong[J]. Construction Management and Economics, 2011, 29 ( 3 ): 233-245.
7Guo H L, Li H, Skitmore M. Life cycle management of construction projects based on Virtual Prototyping technology[J]. Journal of Management in Engineering, ASCE, 2010, 26 (1): 41 47.
8Guo H L, Li H, Chan G, Skitmore M. Using game technologies to improve the safety of construction plant operations[J]. Accident Analysis and Prevention, 2012, 48: 204-213.
9Blaine Fanning. Implementing BIM on infrastructure: comparison of the two bridge construction projects [J ]. Practice Periodical on Structural Design and Construction, 2015,20(4) : 1 - 6.