高压输电线路测量是输变电设计的基础,叙述了赞比亚下凯富峡电力送出项目复测的实施过程,并对复测过程中的各种测量方案进行了探讨,通过探讨总结测量经验,为后期铁塔基础施工做好准备。
The measurement of high-voltage transmission line is the basis of design of the transmission line.This article describes the implementation process of the re-measurement of the transmission line in Zambia,and discusses various measurement schemes in the re-measurement process.We prepare for later tower foundation construction.