摘要
孟楼渡槽单跨30 m、单槽重达1 200 t,为国内最重的架设预制矩形渡槽。槽身结构复杂,槽身为大跨度薄壁三向预应力结构,空间结构受力复杂。为监测槽身吊装前后钢筋应力变化情况,在槽身吊装移动前后进行了槽身钢筋应力监测,以控制吊装参数,指导后续渡槽施工。
Menglou aqueduct is the heaviest prefabricated rectangular aqueduct in China.The single span is30m long and1200tons heavy.The groove body has a large span with complex structure,thinwall,and three directional pre-stressed.Stress monitoring of the steel bar in the groove body is carried out before and after its hoisting and installation,with the aim to understand the stress changes,control the lifting parameters and guide the follow-up construction of aqueduct.
作者
马宇航
周强
张波
MA Yu-hang;ZHOU Qiang;ZHANG Bo(Zhejiang Huadong Engineering Safety Technology Co., Ltd.)
出处
《大坝与安全》
2018年第5期40-43,47,共5页
Dam & Safety
关键词
孟楼渡槽
单跨
槽身
吊装
钢筋应力
监测分析
Menglou aqueduct
single span
groove body
hoisting and installation
reinforcement stress
monitoring and analysis