摘要
根据马马崖水电站工程整体施工进度计划,导流洞下闸后,为确保洞内施工人员及设备安全,要求永久堵头安全、高效、快速施工完成。为此,结合工程的实际情况,设计了相应的导流洞封堵快速施工技术方案,实施后,安全、快速地完成了施工,导流洞封堵效果好。
According to the construction schedule of Mamaya I Hydropower Station,the permanent tunnel plug is required to be constructed safely and rapidly after the diversion tunnel is closed with gate.Combined with the actual conditions of the project,corresponding rapid construction scheme of tunnel plug was drafted and executed with good effects.
作者
何公义
HE Gong-yi(SINOHYDRO Bureau 16 Co., Ltd., Fuzhou 350003, China)
出处
《广西水利水电》
2018年第6期61-63,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
导流洞
堵头
混凝土
快速
施工
Diversion tunnel
closing plug
concrete
rapid
construction