某选矿厂尾矿事故池接力泵站方案设计 被引量:1

The Option Design of Booster Pump Station of Emergency Tank of Tailing in a Certain Beneficiation Plant
下载PDF
导出
摘要 设计从某选矿厂尾矿事故池接力泵站工程实际出发,结合计算分析提出经济合理的改造方案。该方案不仅满足生产要求,而且达到了节能降耗和可持续发展的目的。 The design starts from the actual and present facts of the booster pump station of emergency tank of tailing in a certain beneficiation plant.Combining the calculation,it analyzes and puts forward economical and reasonable upgrade option.This option cannot only satisfy the production requirements,but also achieve the purpose of energy saving and consumption reducing and sustainable development.
作者 肖祖容 XIAO Zurong(Pangang Group Mining Engineering Research Institute,Panzhihua 617063,China)
出处 《矿业工程》 CAS 2018年第6期41-43,共3页 Mining Engineering
关键词 事故池 接力泵站 节能降耗 可持续发展 emergency tank booster pump station energy saving and consumption reducing sustainable development