摘要
某大桥主桥钢箱梁板单元为正交异性结构,焊接制作过程中产生明显的角变形。本文结合实际工程中控制顶板单元焊接变形的方法,通过计算与有限元技术对关键问题进行了分析。
Steel box beam-slab belongs to the orthotropic structure,and obvious angle deformation may occur during the welding process.Based on the method to control the welding deformation of top slab applied in actual projects,some key issues are calculated and analyzed by using finite element technique.
作者
傅乐平
张子煜
Fu Leping;Zhang Ziyu(No.2 Engineering Co., Ltd. of CCCC Third Harbor Engineering Co., Ltd., Shanghai 200122, China)
出处
《港工技术》
2018年第6期64-66,共3页
Port Engineering Technology
关键词
正交异性结构
有限元分析
焊接变形
orthotropic structure
finite element analysis
welding deformation