摘要
本文通过对富氧底吹熔炼炉造锍熔炼工艺试生产阶段遇到的问题做简单的探讨,总结了一些实际解决办法和生产经验,旨在为同工艺的冶金炉试生产过程提供些许参考。
This paper briefly discusses the problems encountered in the trial production stage of the smelting process of oxygen-rich bottom-blown melting furnace,and summarizes some practical solutions and production experience,aiming to provide some references for the metallurgical furnace trial production process of the same process.
作者
谢云
黄进
张理勤
徐广宇
李富林
宋福玺
XIE Yun;HUANG Jin;ZHANG Li-qin;XU Guang-yu;LI Fu-lin;SONG Fu-xi(Qinghai Copper Industry Co.,Ltd.,Xining 810000,China)
出处
《世界有色金属》
2018年第19期7-8,共2页
World Nonferrous Metals
关键词
富氧底吹熔炼炉
试生产
炉体改造
蘑菇头
渣含铜
品位
oxygen-rich bottom blowing melting furnace
trial production
furnace reform
mushroom head
slag containing copper
grade