期刊文献+

地质测绘工程项目的进度与质量控制研究 被引量:5

Study on progress and quality control of geological surveying and mapping projects
下载PDF
导出
摘要 地质测绘技术是记录和观察地矿构造的工具,在特殊作业环境中需要采用地质测绘技术完成高难度作业,为此研究地质测绘工程项目的进度与质量控制。通过改变测绘地理形态、增设平面测绘和测绘工具使用方法,了解金属矿床地质测绘工程项目的进度控制。在后期的项目中需要完成高质量的地质测绘工作,技术人员通过优化地质测绘质量、提高测绘技术的精准度和加强数字化图形编辑的精确度对地质测绘工程项目进行质量控制,从而提高项目完成的质量。 Geological surveying and mapping technology is a tool for recording and observing geological and mineral structures.It is necessary to use geological surveying and mapping technology to complete difficult operations in special working environment.Through changing the geographic form of Surveying and mapping,adding plane surveying and mapping tools,the progress control of geological surveying and mapping project of metal deposits is understood.In the later stage of the project,it is necessary to complete high quality geological surveying and mapping work.Technical personnel can control the quality of geological surveying and mapping project by optimizing the quality of geological surveying and mapping,improving the accuracy of Surveying and mapping technology and strengthening the accuracy of digital graphics editing,so as to improve the quality of the project.
作者 白龙 BAI Long(hunan bureau of geology and mineral exploeation and development bureau 403 teams,Changde 415000,China)
出处 《世界有色金属》 2018年第19期211-211,213,共2页 World Nonferrous Metals
关键词 地质勘测 专业素养 地矿地质环境 勘测数据 geological survey professional attainment geological and geological environment survey data
  • 相关文献

参考文献1

共引文献3

同被引文献19

引证文献5

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部