期刊文献+

基于可靠性的混联系统的动态预防性维护策略 被引量:5

Dynamic preventive maintenance strategy for hybrid system based on reliability
下载PDF
导出
摘要 以多设备混联系统为研究对象,通过优化组合成本,给出了一种以作业计划为约束的修复非新的动态预防性维护策略.在建模过程中考虑到设备因预防性维护次数增加造成可靠度逐渐下降的情况,引入了役龄递减因子与故障率递增因子优化模型.该维护策略达到了不中断生产作业的目标,使维护计划与作业计划之间的冲突得以协调.通过算例分析,验证了该维护策略的合理性和经济有效性. Taking multi-device hybrid system as research object and by means of optimizing combined cost,a dynamic preventive maintenance strategy for non-new repairation is proposed,where the job plan is taken as a constraint.In the process of modelling,when the case of gradual decline of equipment reliability due to the increase of the number of preventive maintenance is taken into consideration,an optimization model of sevice age reduction factor and hazard rate increase factor is introduced.This maintenance strategy will make the goal of interruption-free production operation to be achieved and the conflict of maintenance plan with job plan to be aligned.The reasonableness and economic efficiency of this maintenance strategy are verified by means of an evaluation example.
作者 李有堂 程钥 任泽海 LI You-tang;CHENG Yue;REN Ze-hai(College of Mechano-Electronic Engineering,Lanzhou Univ. of Tech.,Lanzhou 730050,China)
出处 《兰州理工大学学报》 CAS 北大核心 2018年第6期35-38,共4页 Journal of Lanzhou University of Technology
基金 国家自然科学基金(71461018)
关键词 混联系统 可靠性 预防性维护 修复非新 作业计划 hybrid system reliability preventive maintenance non-new repairation job plan
  • 相关文献

参考文献5

二级参考文献24

  • 1应保胜,但斌斌,张华.生产计划和预防性维修计划的统筹优化模型[J].机械工程学报,2005,41(3):226-228. 被引量:14
  • 2毛昭勇,宋保维,李正,胡海豹.并联系统预防性维修费用的优化方法[J].系统仿真学报,2005,17(4):819-821. 被引量:10
  • 3蔡景,左洪福,刘明,耿端阳.复杂系统成组维修策略优化模型研究[J].应用科学学报,2006,24(5):533-537. 被引量:34
  • 4潘光,毛昭勇,宋保维,胡海豹,王鹏.预防性维修周期优化决策研究[J].机械科学与技术,2007,26(4):518-520. 被引量:22
  • 5CASSADY C R, KUTANOGLU E. Integrating preventive maintenance planning and production scheduling for a singlemachine [ J ]. IEEE Transactions on Reliability, 2005, 54 (2) :304-309.
  • 6SORTRAKUL N, NACHTMANN H L, CASSADY C R. Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine [ J ]. Computers in Industry, 2005,56(2) : 161-168.
  • 7RUIZ R, CARLOS G J, MAROTO C. Considering scheduling and preventive maintenance in the flowshop sequencing problem[ J ]. Computers & Operations Research, 2007, 34 (11): 3314-3330.
  • 8OSMAN M S, ABO-SINNA M A, MOUSA A A. An effective genetic algorithm approach to muhiobjeetive routing problems (MORPs) [ J]. Applied Mathematics and Computation, 2005, 163(2) : 769-781.
  • 9Ashayeri J, Teelen A. A production and maintenance planning model for the process industry. International Journal of Production Research, 1996, 34: 3 311-3 326.
  • 10Banerjee A, Burton J S. Equipment utilization based maintenance task scheduling in a job shop. European Journal of Operational Research, 1990, 45(2-3): 191-202.

共引文献76

同被引文献36

引证文献5

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部