摘要 在山区架空输电线路工程中,当坡度较陡时常因桩基础悬臂过长导致桩顶在荷载作用下产生过大的水平位移,无法立塔。设计了一种新型的抗侧移子母桩基础,在方便设计与施工的同时,可有效降低桩顶端水平位移,减小山区地形对塔位选择的限制。通过山西-江苏±800 kV特高压直流线路工程JC30103A塔型的实际算例验证了子母桩基础的可行性。 When overhead power transmission line is set up in mountainous areas,the over-length of thecantilever of pile foundation leads to the excessive horizontal displacement of pile top under load and no way toerect the tower in the case of steep slope. This paper designs a new type of anti-lateral shift primary pilefoundation,which is convenient for design and construction,and simultaneously effectively reduces thehorizontal displacement of pile top and the limitation of mountain topography on the choice of tower position. Apractical example of JC30103 A tower type in the Shanxi-Jiangsu ±800 kV ultra-high voltage DC line projectis given to verify the feasibility of the primary-secondary pile foundation.
作者 齐兴斌 王远 王旭 邹相国 易黎明 QI Xingbin;WANG Yuan;WANG Xu;ZOU Xiangguo;YI Liming(Power China Hubei Electric Engineering Co.Ltd.,Wuhan Hubei 430040,China)
出处 《湖北电力》 2018年第4期61-66,共6页 Hubei Electric Power
关键词 附加刚臂 子母桩 力法 桩顶端水平位移 铰接 特高压 additional rigid arm primary-secondary pile force method horizontal displacement of pile top hinge joint ultra-high voltage
  • 相关文献

参考文献7

二级参考文献19

  • 1张正国,傅学怡,王建俊,韦宇宁.带刚臂超高层结构工作性能研究[J].建筑结构学报,1996,17(4):2-9. 被引量:31
  • 2刘慎之.关于山区深浅基础的使用及基础抗剪面的计算[J].电力建设,1990,11(9):18-20. 被引量:3
  • 3余安东.用水平加强层控制高层结构的侧移[J].建筑结构学报,1988,(6).
  • 4Dym C L 袁祖贻等(译).固体力学变分法[M].北京:中国铁道出版社,1984..
  • 5Smith B S.高层建筑结构分析与设计[M].北京:地震出版社,1993..
  • 6袁兴隆.高层建筑加强层及转换层的研究[M].上海:同济大学,1996..
  • 7朱杰江.带加强层框架-芯筒结构体系受力特性的研究[M].南京:河海大学,2000..
  • 8金问鲁.高层建筑结构的连续化分析[M].北京:中国铁道出版社,1990..
  • 9余安东,建筑结构学报,1988年,6期
  • 10何若全

共引文献74

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部