摘要
通过对山西汾西正晖煤业昌元煤矿火区塌陷区综合治理工程地质灾害发生的原因分析,以大量的施工中岩土体发生崩塌、滑坡实例为依据,进行了客观、深入地调查研究。施工采取科学、有效、可靠的综合性技术手段,措施得当,治理效果显著。不仅对全区的地质灾害治理、生态恢复工作有借鉴作用,而且对后续地下矿产资源的开发利用,以及类似区域的恢复治理工作提供了宝贵的实践工作经验。
Based on the analysis of the causes of geological disasters caused by comprehensive control engineering in changyuan coal mine fire area, Zhenghui coal mine, Fenxi, Shanxi Province, this paper makes an objective and in-depth investigation and study on the collapse and landslide of rock and soil mass in a large number of construction projects. The construction adopts scientific, effective and reliable comprehensive technical means, proper measures and remarkable control effect. It not only plays a role in the geological disaster control and ecological restoration of the whole region, but also provides rich practical work experience for the subsequent exploitation and utilization of underground mineral resources and the restoration and rehabilitation of similar regions.
作者
葛治勋
Ge Zhixun(Shanxi Metallurgical Geotechnical Engineering Survey Co., Ltd.,the Third Bureau of the General Administration of Metallurgy and Geology of China, Taiyuan 030002, China)
出处
《山西建筑》
2019年第2期72-74,共3页
Shanxi Architecture
关键词
火区
塌陷区
岩土体
综合治理
生态恢复
fire area
subsidence area
rock and soil mass
comprehensive treatment
ecological restoration