期刊文献+

风水互补系统最佳风电配置容量方法研究 被引量:3

The Study on Method of Optimal Allocation of Wind Power Capacity of the Wind Power and Hydropower Complementation System
下载PDF
导出
摘要 依托已建水电站输送通道、互补送出风电出力的可行性,为规划风电场的送出开辟了新途径;以云南省某大型水电站及其周边规划风电项目为例,提出了风水互补系统的最佳风电配置容量方法和成果,挖掘现有水电输送通道潜力进行风水互补送出。 The paper blazed a new trail to make planning of power delivery from wind farms,which uses the power transmission lines of the existing hydropower plants to deliver the power output from the wind farms in a complementary way.Taking a large hydropower plant and its surrounding planned wind farms in Yunnan Province as an example,the paper put forward both method and results of the optimal allocation of wind power capacity of the wind power and hydropower complementary system,which is of significance in exploring the potential of utilizing the existing hydropower transmission line to deliver wind farm power in a complementary way.
作者 张自宽 王玉赞 邱良 ZHANG Zi-kuan;WANG Yu-zan;QIU Liang(Power China Kunming Engineering Corporation Limited, Kunming 650051, Yunnan, China)
出处 《云南水力发电》 2018年第6期17-19,23,共4页 Yunnan Water Power
关键词 风水互补系统 最佳风电容量 互补送出 输送通道 wind power and hydropower complementary system optimal wind power capacity complementary power delivery power transmission channel
  • 相关文献

参考文献4

二级参考文献26

共引文献10

同被引文献58

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部