摘要
通过乌弄龙水电站尾水洞出口2×2500 k N-34 m固定卷扬式启闭机主起升机构选型计算,提出了该类设备设计审查阶段应该提供的设计计算资料及设计深度,为获取设计合理、运行安全的设备提供了有力保障。
Based on the selection calculation of the hoisting mechanism for the 2×2 500 kN-34 m fixed winch hoist at the tailwater tunnel exit of Wunonglong Hydropower Station,the calculation document and depth of design that should be provided to the mechanism with the same type during the design review stage are proposed,which provides a powerful guarantee for reasonable design and safe operation.
作者
张文科
ZHANG Wenke(Huaneng Lancang River Hydropower Company Limited,Kunming 650200,China)
出处
《华电技术》
CAS
2018年第12期42-44,47,79,共5页
HUADIAN TECHNOLOGY
关键词
水电站
启闭机
钢丝绳
卷筒计算
减速器
应力
尾水洞
起升机构
hydropower station
hoist
wire rope
reel calculation
reducer
stress
tailwater tunnel
hoisting mechanism