碾压式沥青混凝土心墙冬季施工试验研究 被引量:4

Experimental study on winter construction of roller compacted asphalt concrete core wall
下载PDF
导出
摘要 沥青混凝土心墙因其众多优势逐渐应用在水利工程中,为研究碾压式沥青混凝土心墙在冬季特殊条件下施工,选取不同实验材料及设备、设置不同碾压遍数等试验条件,进行对比分析得出:沥青混凝土可在冬季进行施工且砾石含量在70%、初始碾压温度130~145℃时施工效果相对较好。 Asphalt concrete core wall is gradually applied in water conservancy projects due to its many advantages.In order to study the construction of roller compacted asphalt concrete core wall under special conditions in winter,different experimental materials and equipments are selected,and different rolling passes are set.The test conditions and comparative analysis show that the asphalt concrete can be constructed in winter and the gravel content is about 70%,and the initial rolling temperature is 130~145℃.
作者 凌华军 LING Hua-Jun(Jiangxi Huadong Longyuan Construction Co.,Ltd.,Jingdezhen 333400,China)
出处 《水科学与工程技术》 2018年第6期66-69,共4页 Water Sciences and Engineering Technology
关键词 沥青混凝土 冬季施工 碾压 试验 asphalt concrete winter construction rolling test
  • 相关文献

参考文献11

二级参考文献36

共引文献85

同被引文献12

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部