摘要
送电线路施工中跨越铁路是架线施工的难点,影响因素多,跨越施工风险大。制定切实可行的跨越施工方案是完成跨越施工的重要工作。文中通过750kV线路工程跨越宁西铁路施工实例,总结跨越施工中需要解决的问题。
Crossing railways in transmission line construction is a difficult point in line erection construction.There are many influencing factors and great risks in crossing construction.It is an important work to formulate a feasible construction plan for spanning construction.Through the construction example of 750kV line project crossing Ningxi Railway,this paper summarized the problems that need to be solved in crossing construction,and provided reference for more railway crossing construction in the future.
作者
孙强
SUN Qiang(Shaanxi Power Transmission and Transfer Engineering Co.,Ltd.,Xi'an 710014,China)
出处
《通信电源技术》
2018年第11期93-95,共3页
Telecom Power Technology