摘要 为解决港珠澳大桥沉管隧道结构受力问题,创新性地提出了一种全新的部分无黏结预应力混凝土结构形式。该结构形式既能通过预应力保证结构全断面受压,并以此来提高接缝处节段接头的抗剪和防水能力;又能通过节段接头毫米级张开来释放弯矩内力,降低预应力用量。该新型结构形式已成功应用于港珠澳大桥沉管隧道施工图设计,并有效支撑了港珠澳大桥沉管隧道半刚性管节结构体系的创新。 In order to solve the structure problem of the Hongkong-Zhuhai-Macao Bridge immersed tunnel,we innovatively presented a new type of partially unbonded prestressed concrete structures.The structural form can ensure the full section compression of the structure through prestressing to improving the shear resistance and waterproof capacity of the segment joints.It can also release the internal moment force through the millimeter level expansion of segment joints to reducing the amount of prestress.The new structure has been successfully applied to the construction drawing design of the immersed tube tunnel of the Hongkong-Zhuhai-Macao Bridge,and has effectively supported its innovation of the semi-rigid pipe-joint structural system.
作者 李毅 刘晓东 刘凌锋 LI Yi;LIU Xiao-dong;LIU Ling-feng(CCCC Highway Consultants Co.,Ltd.,Beijing 100088,China)
出处 《中国港湾建设》 2019年第1期35-40,共6页 China Harbour Engineering
关键词 港珠澳大桥 沉管隧道 部分无黏结预应力混凝土 半刚性管节 节段接头 Hongkong-Zhuhai-Macao Bridge immersed tunnel partially unbonded prestressed concrete semi-rigid tube segment joints
  • 相关文献

参考文献3

二级参考文献12

  • 1陈海军.沉管隧道主体结构设计关键技术分析研究[J].隧道建设,2007,27(1):46-50. 被引量:15
  • 2吕碧幸.世界最大级沉管隧道[J].地下工程与隧道,1994.(1).
  • 3Su L, Kang L. Hydraulic Analysis of Immersed Tunnel Element's Immersion and Its Application [M]. 2011.
  • 4Bauduin C, Depuydt P. Design and construction of an im- mersed concrete tunnel using an integrated dock facility [J]. TAILOR MADE CONCRETE STRUCTURES: NEW SOLUTIONS FOR OUR SOCIETY, 2008.
  • 5Mortier H, Hakkaart C J A, Hart W M T. Settlements of HSL immersed tunnels [J]. Geotechnical Aspects of Underground Construction in Soft Ground, 2006.
  • 6宿文德.博斯普鲁斯海峡沉管隧道管段制作工艺研究[EB/OL].(2015-08-14)[2016-04-10].http://old. tunnelling. cn/sites/suidao/ConPg. aspx?InfId=a4892b65-a8a6-4886-a662-0c86aab20826&CtgId=58efe177-0cf2-4248-b3b2-98bce94a686c.
  • 7中交公路规划设计院有限公司.港珠澳大桥主体工程岛隧工程施工图设计:管节接头、节段接头施工图[R]. 2012.
  • 8HANS DE WIT, GERT-JAN BAKKER, LI Ying. Consulting com-ments on water stop installation of HZMB[K]. Zhuhai: STTG JointVerture, 2013.
  • 9陆明,陈鸿.超深埋海底沉管隧道接头防水设计探讨[J].中国建筑防水,2012(8):17-21. 被引量:14
  • 10杨绍斌,苏怀平,张洪.大体积混凝土入模温度控制研究[J].中国港湾建设,2013,33(4):38-41. 被引量:11

共引文献19

同被引文献29

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部