期刊文献+

新建火电机组热工调试工程实践与研究

Practice and Research on Thermal Engineering Commissioning of New Thermal Power Units
下载PDF
导出
摘要 电能是我国经济社会发展的能源基础,火电在我国的电力结构之中仍然占据着很大的比重。火力发电必须要有安全可靠的大容量和高参数的发电机组,因此新建火电机组热工调试必须受到重视。本文从新建火电机组热工调试的意义、调试的简要流程以及调试的内容3个方面进行论述。 Electrical energy is the energy foundation of China’s economic and social development. Thermal power still occupies a large proportion in China’s power structure. Thermal power generation must have safe and reliable large-capacity and high-parameter generator sets, so thermal commissioning of new thermal power units must be taken seriously. This paper discusses the significance of the thermal commissioning of the new thermal power unit, the brief process of the thermal commissioning of the new thermal power unit and the thermal commissioning of the new thermal power unit.
作者 刘菁 Liu Jing
出处 《电力系统装备》 2018年第12期74-75,共2页 Electric Power System Equipment
关键词 新建火电机组 热工调试 实践 new thermal power unit thermal debugging practice
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部