摘要 中速磨煤机的工作转速一般在50~300r/min,其在以煤炭作为燃料的许多项目中均得到了较为理想的运用。为了较好实现中速磨煤机的可靠运转,尽量降低可能形成的明显故障问题,在中速磨煤机的安装过程中予以严格把关是比较重要的一环,应该确保其安装规范标准。本文重点围绕着中速磨煤机的安装方案,从前期准备工作以及具体安装要点两个方面进行了简要分析论述,希望具备参考借鉴价值。 Medium-speed pulverizer usually works at a speed of 50-300 r/min,and it has been used in many projects of coal as fuel.In order to better realize the reliable operation of medium-speed pulverizer and minimize the possible obvious failure problems,the installation process of the specific medium-speed pulverizer should be strict.Gatekeeping is a more important part,and it should ensure that its installation is more standard.Based on this,this paper focuses on the installation scheme of medium-speed pulverizer,from two aspects of preliminary preparatory work and specific installation points are briefly analyzed and discussed,hoping to have a reference.
作者 徐振涛 Xu Zhen-tao
出处 《电力系统装备》 2018年第11期163-164,共2页 Electric Power System Equipment
关键词 中速磨煤机 安装 准备 要点 medium speed coal mill installation preparation main points
  • 相关文献

参考文献6

二级参考文献6

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部