期刊文献+

变电站改扩建中的变电二次设计分析

Analysis of Two Times Design of Substation in Substation
下载PDF
导出
摘要 随着城市化水平不断提升,用电负荷不断增加,为进一步提高变电站的运行质量,变电站往往需要扩建。在变电站改建过程中,针对电力系统设备出现的老化问题,通常需要提高设备性能,做好变电二次设计,保证用电安全,消除周围不良因素的影响,为用户提供高质量的服务。因此,文章针对变电站改扩建中的变电二次设计进行分析,并且提出相应的解决对策和建议。 With the continuous improvement of urbanization level and the increasing load of electricity,in order to further improve the operation quality and smooth operation of substations,substations often need to be reconstructed.In the process of substation reconstruction,aiming at the aging problem of power system equipment,it is usually necessary to improve the performance of equipment,make the two design of substation,ensure the safety of electric power,eliminate the influence of adverse factors,and provide users with high quality services.Therefore,this paper analyzes the two times design of substation in the substation,and puts forward the corresponding countermeasures and suggestions.
作者 顾华娟 Gu Hua-juan
出处 《电力系统装备》 2018年第4期89-90,共2页 Electric Power System Equipment
关键词 变电站 改扩建 变电二次设计 设计策略 substation reconstruction and expansion two times design of substation design strategy
  • 相关文献

参考文献3

二级参考文献8

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部